MINING OPERATIONS CONSOLE

Mining Fracture Analyser

SC 4.10.1 LIVE Bridge Offline OCR Ready Data Staged
Mining Database Fleet Roster
☀️Planner Day
02

Fracture Verdict

AWAITING FLEET
Deploy a mining vessel to evaluate this rock.
MFA uses the deterministic v5.35 calculation mechanics.
Power margin —
Required power—
Available power—
Final resistance—
Final instability—
0Required
03

Fleet Planner

This is the single fleet control for the operation: who is present, what each vessel actually has fitted, and whether it is currently active, available to assist, or standing by.

Operation Fleet Quantity creates one editable vessel card per ship.
Active = lasing now Available = can assist Standby = excluded
Actual Fleet Loadouts Set what each ship really has fitted. MFA recommendations are calculated separately and never overwrite these selections.

SELECT AT LEAST ONE VESSEL ABOVE…

Auto Solver: uses this fleet as the available ship pool. Active vessels contribute to the current fracture verdict; Available and Standby states describe your real operation only. Ideal Recommended Solutions are calculated independently from Target Acquisition.